About searching

Keywords
 
Types
Only of the type(s)
Languages
Languages

March 22, 2026 Service Changes

GoRaleigh will implement service improvements designed to increase frequency, improve reliability, and expand access across the system. With the addition on Route 2 increasing to 15-Minute frequency, GoRaleigh now operates 11 high-frequency routes providing 15-minute service or better throughout the city within the network. 

Funding through the Wake Transit half-cent sales tax allows GoRaleigh to continue growth in one of the Four Big Moves from the Wake Transit Plan, increasing our frequent, reliable urban network. 


 

Route 14 | New Route

GoRaleigh is introducing Route 14 - Atlantic, expanding service coverage and providing new travel options.

Route 14 will:

  • Improve access to key destinations
  • Strengthen connections to other GoRaleigh routes
  • Support growing ridership demand in the corridor

Route 14 - Atlantic (Route Page Coming Soon)  

Route 14 Schedule (Coming Soon) 


Route 2 – Increased Frequency to 15-Minutes

Route 2 will now operate every 15 minutes throughout the day.

This improvement reduces wait times and makes travel more convenient and flexible. With this change, GoRaleigh’s High-Frequency Network expands to 11 routes offering 15-minute service or better, making it easier than ever to ride without checking a schedule.

Route 2 - Falls of Neuse


Route 17 – Increased Frequency to 30-Minutes

Route 17 will now operate every 30 minutes.

This increased frequency improves trip flexibility, reduces wait times, and enhances connections along the corridor.
 

Route 17 - Rock Quarry


Route 1 and 2 Alignment Changes

Routes 1 and 2 will be realigned to better serve riders along routes 1. 2 and 14

Alignment Changes Map


Previous Service Changes

To explore previous service changes click below. 

Previous Service Changes